Actually, a lot has happened

Hi Folks,

Oh my gosh, a lot has happened since I wrote last – it’s hard to figure out where to begin.  Can’t decide if I just go ahead and post a picture of where things stand right now or make you wait and go back to week two.

I think I’ll do a little of both – show you one picture of how things are now and then go back and fill in the details by weeks.  All along the way there have been things that didn’t go as planned.  Researching materials has been and remains time consuming.  Some items are delayed in arriving.  Some come and are the wrong thing.  People get sick.  Items get charged to me twice – blah, blah, blah.

I’m sure that anyone who has built anything, or taken on any big project knows that these delays are to be expected.  In fact, even though it tries my patience, I know that it has been necessary to working out the right order of things and making the correct choices to have these delays.  I just don’t like it much.

Here’s Gyrtle right now, in all her semi-completed, complete dried-in state.

You will see that I have all my siding (almost) completely stained (almost).  Also, I have my complete roof on (almost – if you look close).  Oh well, one day these things will be completely complete.

So, back to week two.  There are two nests of magpies in the trees behind my house.  This one seemed to be claiming the territory of this strange object coming up so close to its home.

The end of the first week was tough because we didn’t know how to proceed.  I’m going to have radiant floor heat and we really didn’t know what materials to use and how to install them.  If the radiant floor was to go under the subfloor we couldn’t proceed.  But a few trips to ABC Plumbing and consulting with Kurt helped us come to the conclusion that we could go ahead and put the subfloor down with insulation in it and much later in the process we could put the radiant floor panels down.  So we were finally ready to proceed!

In these pictures you’ll see the progression from having just the aluminum which goes under the whole of the structure for protection from water, to putting in the floor joists, having the shiny aluminum that covers both sides of my insulation installed and finally the subfloor is on.  Most of the pictures are of me enjoying walking on my floor the first time and seeing that my idea of the space and what I want in it will actually work.  The only floor missing is my bedroom which will be up on the gooseneck.

Oh Happy Day!

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s

Website Built with WordPress.com.

Up ↑

%d bloggers like this: